Migration As A Service

Thinking about moving to the cloud?. We offer you insights into your own data that might have missed your attention.

Migration Goals

  • check
    Migrate data from legacy system to Oracle HCM
  • check
    Minimum business disruption during cut-over process
  • check
    Minimum involvement of business in the migration process
  • check
    Audit and Control of the process

MAAS approach

  • check
    Pre-configured migration routines customized to suit requirements
  • check
    Automated execution to minimize the cut-over window
  • check
    Templated approach for Requirement Analysis to Sign off
  • check
    Dashboards and reconciliation reports to provide audit trial and visibility

Whisk away the following data migration challenges

  • icon_Complexity

    Complexity

    The data format required for input files by Oracle is often complex for many of the business objects.

  • icon_Competency

    Competency

    Oracle Fusion tools and technology tend to be challenging for technical consultants from the user side who are not well versed with the same.

  • icon_mapping

    Data Mapping

    A relational 1 to 1 mapping may not always be possible between the legacy data and Oracle fusion fields.

  • icon_Cleansing-53

    Cleansing

    Cleansing legacy data prior to loading the same on Oracle Fusion Cloud might be onerous without expert guidance.

  • icon_data-trans

    Data Transformation

    The varying requirements of data transformation for a data migration project calls for software assistance.

  • icon-_Reconciliation

    Reconciliation & Sign-off

    Manual reconciliation between legacy data and loaded data within the stringent timeline of a cut over window is next to impossible.

Advantages of MAAS approach

With data migration totally off your hands at the most optimum cost, you will be able to focus on the other implementation challenges which require your attention.
  • icon_Visibility-for-business
    Visibility for business

  • icon_Data-for-testing-cycles
    Data for testing cycles

  • icon_Fixed-migration-cost
    Fixed migration cost

  • icon_Fixed-migration-cost-copy
    Shorter cut-over window

  • icon_100-Migration-success
    100% Migration success

  • icon_Confidence-in-migrated-data
    Confidence in migrated data